This project was designed very poorly. There are a lot of mistakes. It was a fast design. Nobody reviewed the design, and as a result, there are many mistakes, and that’s why there are so many changes and requests for information. We’re going to lose an enormous amount of money, and so are the subcontractors.The SDA says it’s the district’s fault for underestimating the total cost of the project. Meanwhile, Egg Harbor's high school kids have spend years jammed into a portion of the building and barred from entering the cafeteria and the theater. The library is open, but only to 50 kids at a time.
Labels: SDA